Temporary road closures are approved on a case-by-case basis to accommodate construction activity, utility work, and special events such as neighbourhood block parties. All current and upcoming temporary road closures are listed on this page. For more information on a specific closure, contact the Infrastructure Services department at infrastructure@coldlake.com or 780-594-4496.
Date | Location | Details |
---|---|---|
May 15 to May 20, 2023 | From 10 Street - 12 Street | Milling and paving of 11 Avenue between 7am to 7pm each day. |
May 15 to May 27, 2023 | Between 11 Avenue and 8 Avenue | Landscaping and clean up of 11 Street between 7am to 7pm each day. |
May 15 to May 19, 2023 | Along Highway 28 | Spring maintenance of traffic lights between 2pm to 11pm. |
May 16 to May 31, 2023 | 16 Street between 75th Avenue to 69th Avenue | Construction related to the new Operations Centre. |
May 17 to May 20, 2023 | 16 Avenue between 7 Street and 6 Street | Touch up settlements in topsoil and line painting between 7am to 7 pm. |
May 26 to June 2, 2023 | Highway 28 - 10 Street to 17 Street and 57 Avenue to 43 Avenue | Highway grass boulevard sweeping 8am to 3pm each day. |
Applications must be received at least two weeks prior to the proposed date of the closure (two months notice is required in the case of a special event). Depending on the scope of the closure, a development permit, damage deposit or proof of insurance may be required. The closure may also be advertised on City of Cold Lake social media channels and in the local newspaper. All road closure notices must be approved by Cold Lake Fire-Rescue to ensure optimum emergency response times can be maintained during the closure.
See the Temporary Road Closure policy
Download the Temporary Road Closure application
Contact Us